Production Hall Hettingen / Barkow Leibinger + Regine Leibinger

Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - ForestProduction Hall Hettingen / Barkow Leibinger + Regine Leibinger - Windows, FacadeProduction Hall Hettingen / Barkow Leibinger + Regine Leibinger - FacadeProduction Hall Hettingen / Barkow Leibinger + Regine Leibinger - BeamProduction Hall Hettingen / Barkow Leibinger + Regine Leibinger - More Images+ 7

  • Architect In Charge: Barkow Leibinger, Frank Barkow, Regine Leibinger
  • Design Team: Tobias Wenz, Andreas Lang, Hiroki Nakamura, Ina Reinecke, Florian Steinbächer, Ludwig Uphues
  • Underground Engineering: Ingenieurbüro Beck
  • City: Hettingen
  • Country: Germany
More SpecsLess Specs
Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - Image 12 of 12
Sections

Text description provided by the architects. Trumpf GmbH the world largest manufacturer of high tech machine tools will be expanding their existing branch factory near the village of Hettingen in the Swabian Alb. Situated in a picturesque valley this will be the second addition undertaken by Barkow Leibinger the first (shops and offices of 1500 sqm.) was done in 2009.

Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - Forest
© Ina Reinecke

A new master plan anticipates the construction of new production and assembly in four phases. In July 2013 the first of these phases, a new production hall with 3400 sqm, was realized after only 13 months of construction.

Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - Windows, Facade
© Ina Reinecke

Organized as a simple repetitive shed construction of seven bays the production hall is bracketed by two stories of offices (to the north) and a drive-through loading bay (to the south). For the production and assembling of oversized flatbed laser machines a column free and flexible space was required. The bays measure 24m in width and 13m at the highest point of the shed. 

Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - Facade
© Ina Reinecke

The steel framework of the roof construction allows north-facing skylights within the structural depth; together with the 3m high strip window at ground level they provide daylight for the working areas. 

Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - Beam
© Ina Reinecke

The permanent long façade facing the Lauchert Creek and valley is articulated as a gently folded origami of corrugated metal and glass to scale the factory building to the neighboring singlefamily houses with pitched roofs. 

Production Hall Hettingen / Barkow Leibinger + Regine Leibinger - Windows, Forest
© Ina Reinecke

The office front is integrated into the shed volume but has a mater of fact gridded façade. The roof as a 5th facade is planted with local vegetation to better integrate into the scenic valley.


Project gallery

See allShow less

Project location

Address:Hettingen, Germany

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Production Hall Hettingen / Barkow Leibinger + Regine Leibinger" 26 Dec 2013. ArchDaily. Accessed . <https://www.archdaily.com/461530/production-hall-hettingen-barkow-leibinger-frank-barkow-regine-leibinger> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.